CPS

One Stop Shop In Manufacturing Systems

If you’re losing efficiency with a sub-par pellet or with raw materials, we can help.

Meeting Your Needs, Creating A Plan

Our team will design, install, train and follow-up to make sure you have a seamless transition.

Our team really is a one-stop-shop. We will help you from product formulation, to sampling, to manufacturing the perfect pelleting line to create your pellet on-site and be in full production. If we don’t do it, we know the right person for the job.

Once you partner with CPS, know that your pelleting, manufacturing, bagging and logistics is taken care of. Now all that’s left for you to do is sell, sell, sell.

Testing

Testing

Engineering & Design

Engineering & Design

Installation

Installation

Consulting

Consulting

The CPS Process

Our process engineering team provides a step by step plan to take your idea and turn it into a fully integrated manufacturing line. Here are the six steps we use to do it.

STEP 01:
Process Flow Engineering Concept CAD Design

We help you determine your equipment requirements and answer engineering questions. We provide estimates on equipment needed via our 25 + vendors. You can use the CAD file as a visual aid for board members and potential investors

STEP 02:
Custom Detailed CAD Design

The detailed CAD file includes specific dimensions and individual CAD blocks for each piece of equipment. We use this file to send to our fabrication vendors for creating transitions, storage bins, conveyors, cat walks etc.

STEP 03:
Equipment Selection

We sell high quality American and Canadian made equipment in carbon steel, galvanized, aluminum and stainless steel (food grade 304 or 316). Equipment typically takes 6-12 weeks to manufacture depending on what it is.

STEP 04:
Project Management Services & Equipment Installation

We offer a team of highly trained pellet line installers who will assemble the pellet line on-site at your facility. If this is not required, we do also offer a project manager to come and oversee your team assembling the pellet line.

STEP 05:
On-Site Start-Up & Troubleshooting Service

We offer your employees hands-on training sessions on site during line commissioning. This training will help your team determine maintenance schedules, standard operating procedures and help you get past the initial learning curve of manufacturing a new product.

STEP 06:
Consulting Program Defined & implemented

We offer a tiered program for after-sales technical support and site visits. The program is an annual subscription and keeps your company operating with current industry best practices and continued optimization of your equipment and facility.

Case Study

Customer Problem
Our Solution

Client wanted to develop an organic fertilizer out of composted poultry litter.

CPS SOLUTION: CPS worked with the client in designing a line, provided equipment and commissioned the system.